Using HVAC Repair IQ Before You Get Contractor Quotes
How to search estimates, what is sourced vs. editorial, and how to compare written quotes without treating our site as a bid.
Search by service and city
From the homepage, choose an HVAC service type and your city. For central AC installation, also pick a system configuration (brand, tons, SEER). For AC repair, tune-up, duct cleaning, and smart thermostat installation, you get one estimate per city — the same parts and labor for all systems in our catalog. Ranges use BLS-modeled labor, tonnage bases from public cost-guide medians for installation, calibrated parts inputs for the four non-install services, and editorial brand/SEER and fee assumptions described on the About page.
Use the numbers to plan and to ask questions. They are not a quote from any contractor.
What is sourced vs. editorial
Labor rates by city come from the BLS-based formula on About and /labor-rates. Central AC installation uses tonnage bases from the median of four public cost guides (Fixr, Pick HVAC, HomeGuide, This Old House), a brand ratio of about 1.30 Lennox/Goodman (median of six comparisons, range 1.07–1.74), and an editorial SEER ladder (14→21 = 0.90→1.25; 16 SEER = 1.00). The 1.5-ton base is extrapolated; install hours are fixed at 8 and unsourced. For AC repair, AC tune-up, duct cleaning, and smart thermostat installation, parts/equipment inputs are set so the national median matches the median of three public cost guides (see About for the guide names, figures, and target medians); those four services do not vary price by system — only city labor rate varies. Permit-style fees stay editorial. Figures come from public marketing cost guides, most undated; they are national medians, not shop quotes.
We do not imply that a licensed contractor or industry body reviewed our estimates.
Compare written quotes
Get at least three itemized quotes for the same scope. Compare parts, labor hours, trip/diagnostic fees, and warranty terms. If the discussion turns on hourly labor, use our modeled labor index for your metro as planning context, not as proof a contractor should match our range.
Get at least three itemized quotes in writing before you authorize work. Keep the signed estimate and final invoice together for warranty claims.